Power line burial and motor failure
First the good: OPPD buried the powerline to the wastewater plant (at no cost
to the SID), which is an improvement in safety and power reliability.
And the bad: The original 3-phase 7.5hp aeration system motor (1960's vintage) failed. I suspect OPPD cycling power to it could have been the last leg, but this motor was overdue for failure / replacement, and I have been looking for a cheap backup (to no avail) since I started helping Chuck at the plant. The aeration system has two parallel motors and PD blowers. The other motor was replaced in early 2019 for $1,978.64. Replacing the failed motor is a priority (the parallel setup allows for maintenance time and redundancy in case of failures) and I'll start to gather quotes for presentation to the Board.